Delay Recording System

Delay Recording System (DRS)
Delay Recording System

The BSE Delay Recording System (DRS) is a process analysis tool for steel plants that don’t have a Level 2 automation system yet.

It is operated by the operator at the furnace and helps in the fight against delay times, thus providing a huge potential for productivity increase.

FUNCTIONS

  • Definition of standard setup times and delay code system reflecting the time balance of the process
  • Accurate time measurement based on automatic process signals
  • At each power-off the DRS requests the operator to enter a specific delay code
  • The code system with finite number of codes allows classification and precise documentation of main setup and delay times (and causes)
  • Automatic generation of statistics and reports
  • Process optimization based on standardised reporting
DRS Operator

ADVANTAGES

  • Process optimization based on standardised reporting
  • Reduction of delays provides a huge potential for productivity increase
  • Allocation of (and creation of awareness for) small but frequent delays
  • Increase of transparency and consistency
  • Easiest possible handling enables the operator to focus on the process
  • Multi language support

EXPERIENCES

  • Operating since 2000 at BSW – Germany
  • World-wide satisfied customers using such system
Get in touch with us

E-Mail: info [at] bse-kehl.de (info[at]bse-kehl[dot]de)

Follow us on LinkedIn to stay up-to-date.